A14 Ellington to Fen Ditton information pack
| Publisher: | Department for Transport |
| Publication type: | Reference |
| Published date: | 7 July 2011 |
| Mode/topic: | Roads, Road management |
Information on the withdrawn A14 Ellington to Fen Ditton Scheme.
The A14 Ellington to Fen Ditton (A14efd) scheme was unaffordable and so was withdrawn in the 2010 Spending Review. The Highways Agency and the Department had gathered a large amount of information to support decision making about the scheme, and we are making this available to interested parties.
Most of the information is a combination of material prepared for the planned public inquiry, business case documents and traffic technical notes (known as TNs), which were intended to help inform the Business Case. We have selected some TNs we believe are particularly relevant, for instance because they were not able to be incorporated in the business case before the scheme was withdrawn. A full list of TNs is presented below, and all are available on request.
Also included is a briefing note on value management options. This was commissioned by officials due to the uncertainty about available funding for the scheme and it reviewed, at a very high level, the potential for finding lower cost alternative options. It noted that the statutory processes would need to be restarted if anything substantially different from the A14efd scheme was to be taken forward. The work was undertaken over a very short period and neither the officials nor the consultants involved intended the work to be used to form robust conclusions. No further work was undertaken. The briefing note also looked at options for reducing the cost of A14efd scheme.
In addition to this information the Department is also prepared to allow access to the modelling suite used to support the scheme, subject to the signings of an acceptable Memorandum of Understanding. A key element of this is that the Department and HA will not bear any costs for model development or model runs. If you are interested in pursuing this, or have any other queries, you should use the following contact email details: joy.kabugu@dft.gsi.gov.uk
The Department is taking forward a Joint Study with local partners on alternatives to the withdrawn scheme. This study will report in June 2012 and you may contribute any thoughts you have on alternatives to the withdrawn schemes to the A14 Study using the contact details above. The option generation and sifting phase will set the direction for the study, and this will take place in spring 2011. Any ideas received before this phase completes will have the greatest chance of influencing the study.
Below are brief descriptions of the documents which are available:
- Summary Proof of Evidence (PDF – 176 KB): the summary case for the scheme, prepared for the Public Inquiry:
- Statement of Case (ZIP – 6401 KB): the case for, and details of, the scheme which was prepared for the Public Inquiry.
- Traffic and Economics Proof of Evidence – the traffic and economic assessment of the scheme, prepared for the Public Inquiry:
- Proof of Evidence Traffic and Economics Volume 1 – Text (PDF – 914 KB)
- Proof of Evidence Traffic and Economics Volume 2 – Appendices (PDF – 732 KB)
- Proof of Evidence Traffic and Economics Volume 3 – Figures (PDF – 49 KB)
- T&E Proof of Evidence: General Scheme Arrangement Sheet1 (PDF – 4915 KB)
- Proof of Evidence: General Scheme Arrangement sheet 2 (PDF – 1229 KB)
- T&E Proof of Evidence Figure – T2-1 (PDF – 18,125 KB)
- 5079595-TE-DR-Figure-T1-1 (PDF – 2458 KB)
- 5079595-TE-DR-Figure-T1-2 (PDF – 6349 KB)
- 5079595-TE-DR-Figure-T1-3 (PDF – 6861 KB)
- 5079595-TE-DR-Figure-T1-4 (PDF – 6042 KB)
- 5079595-TE-DR-Figure-T1-5 (PDF – 4301 KB)
- 5079595-TE-DR-Figure-T1-6 (PDF – 3789 KB)
- 5079595-TE-DR-Figure-T1-7 (PDF – 9933 KB)
- 5079595-TE-DR-Figure-T1-8 (PDF – 2253 KB)
- 5079595-TE-DR-Figure-T1-9 (PDF – 1434 KB)
- 5079595-TE-DR-Figure-T3-1 (PDF – 11,161 KB)
- 5079595-TE-DR-Figure-T4-1 (PDF – 2765 KB)
- 5079595-TE-DR-Figure-T4-2 (PDF – 4301 KB)
- 5079595-TE-DR-Figure-T5-1 (PDF – 1229 KB)
- Traffic Forecasting Report – report on the highway model developed to support the A14efd scheme:
- 5062774-TE-DO-RE-716 (PDF – 1229 KB)
- 5062774-TE-DO-RE-716-Appendix I (PDF – 1946 KB)
- 5062774-TE-DO-RE-716-Figure J-1 (PDF – 2867 KB)
- 5062774-TE-DO-RE-716-Figure J-2 (PDF – 7270 KB)
- 5062774-TE-DO-RE-716-Figure J-3 (PDF – 6656 KB)
- 5062774-TE-DO-RE-716-Figure J-4 (PDF – 3482 KB)
- 5062774-TE-DO-RE-716-Figure J-5 (PDF – 2765 KB)
- 5062774-TE-DO-RE-716-Figure J-6 (PDF – 4096 KB)
- 5062774-TE-DO-RE-716-Figure J-7 (PDF – 9830 KB)
- 5062774-TE-DO-RE-716-Figure J-8 (PDF – 2253 KB)
- Economic Assessment Report (EAR) (ZIP – 10,808 KB): Economic Assessment Report for A14efd.
- Business Case (PDF – 204 KB)
and
WebTAG Appraisal Report (PDF -360 KB): the DfT Business Case, and HA WebTAG Appraisal Report from August 2009. - Briefing Note on Value Management Options (PDF – 68 KB): a high level broad brush exercise from summer 2010 considering options for reducing the cost of the scheme, and alternative road based ways of dealing with relevant transport problems.
- Environmental Statement: previously published.
- TN list (PDF – 57 KB): a complete list of all Traffic Technical Notes which were produced. Not all of these were authorised or issued, and this should be taken into account when reviewing them.
- TN 40 (PDF – 389 KB): a note looking at options for phasing construction.
- TN 42 (PDF – 584 KB): a note looking at the value of different parts of the scheme, and options for only delivering parts of the scheme.
- TN 56 (PDF – 292 KB): an assessment of the case for building the A14efd scheme to motorway standards.
- TN 61 (PDF – 122 KB): sensitivity tests around different modelling technical assumptions.
- TN 62 (PDF – 135 KB): the split between national and local benefits from the scheme.
- TN 74 (PDF – 74 KB): a re-assessment of the carbon consequences of the proposed scheme.