Tanks and transportable pressure equipment

Print Print page   Download PDF PDF image

With effect from 1 July 2006 "old tanks" (constructed before 10 May 2004) and “old pressure receptacles” (cylinders, tubes and cryogenic receptacles constructed before 1 July 2003 or other pressure receptacles constructed before 10 May 2004) are no longer permitted to be inspected by a "competent person".  The periodic inspection now has to be carried out by, or under the control of, an "inspection body".

Tank inspection bodies

Information on inspecting RID/ADR, old, and TPED tanks.


Tank inspection bodies (appointments)

Information on the role of tank inspection bodies.


Pressure receptacle inspection bodies

Information on the inspection of pressure receptacles.


Tank inspection - other

Information on appointments applying to transportable pressure equipment, and construction standards.