APPENDIX 9
MODEL INSTRUCTIONS RELATING TO THE CONTROL OF WATERTIGHT DOORS.
Previous Contents Next
PDF Document (32.0Kb)
| MV .............. | Official Number............. |
OPERATIONAL INSTRUCTIONS FOR THE CONTROL OF WATERTIGHT DOORS
1. These are the Operational Instructions are intended to control the operation of the ship's watertight doors as required by the Merchant Shipping (Passenger Ship Construction: Ships of Classes I, II and II(A)) Regulations 1998.
2. All the watertight doors which may be opened during a voyage are to be operated (kept closed or opened) in accordance with the procedures given in these instructions and in the appended diagram entitled "Operation of the Ship's Watertight Doors".
Marking and categorisation of watertight doors
3. Every one of the ship's [* insert appropriate number of doors] doors has been given a specific number and if it is one which may be opened during a voyage assigned one of the following categories - Type A, Type B or Type C - to govern its use in normal conditions.
Voyage conditions
4. The Instructions for the operation of the doors are given for two conditions of any voyage -
5. For the purpose of these Instructions -
Operation of watertight doors
6. The ship's watertight doors should be operated (opened and closed) as follows -
Obstructions in doorways
7. Any watertight door which is open must be kept clear of obstructions which might prevent its rapid closure.
*Control from the bridge
8. The control for watertight doors at the navigating bridge can be set at either "doors closed" or "local control". It must be set at "local control" except during an emergency, a drill or for testing purposes.
[* - delete when not appropriate]
Supervision from the bridge (if applicable)
9. The operation of all watertight doors which are indicated on the bridge control unit must be supervised by the officer in charge of the watch by means of that unit.
Inspections
10. All watertight doors (which are accessible while the ship is on a voyage), their controls and alarms, must be kept in efficient working condition and be inspected at intervals of not more than seven days.
Drills
11. The operation of the watertight doors must be tested at drills carried out as follows:
Instructions in the use of the watertight doors
12. all members of the crew who have occasion to use any watertight doors must be instructed in the safe operation of those doors. in addition written instructions on the safe operation of the doors, given in easily understood terms and illustrated wherever possible, shall be available to all members of the crew. such instructions should be based on the contents of this document.
Emergency situations
13. These instructions govern the operation of watertight doors in either normal conditions or potentially hazardous situations. However when an emergency situation exists the master may ignore these instructions and authorise the opening or closing of any watertight door provided he is satisfied that such action is essential for the overall safety of the ship.
The contents of this document satisfy the requirement of 1. PART III and 2. PART IV of the Merchant Shipping (Passenger Ship Construction: Ships of Classes I, II, II(A)) Regulations 1998 Signed..................................................... Certifying Authority ......................... Date................File No. CM............................ |
(item 1 or 2 in the above stamp should be deleted if not applicable)

Previous Contents Next
PDF Document (32.0Kb)