Manual of Contract Documents for Highway Works
Volume 5 - Contract Documents for Specialist Activities
Follow the links to view the sub contents for that section.
- Section 1 Geodetic Surveys
- Section 2 Not used - Removed - follow the link for more information
- Section 3 Ground Investigation
Part 1- SD 13/97 Documentation Requirements for Ground Investigation Contracts [Amendment No. 1 May 2005]
Part 2- SA 9/97 Ground Investigation Procedure [Amendment No. 1 May 2005]
Part 3- Model Contract Document for Ground Investigation Contracts - England [Revised August 1999]
Part 4- Specification
Part 5- Notes for Guidance on the Specification for Ground Investigation
Part 6- Method of Measurement
- Section 4 Not used
- Section 5 Not used
- Section 6 Not used
- Section 7 Mechanical and Electrical Installations in Road Tunnels, Movable Bridges and Bridge Access Gantries
- Section 8 Trenchless Installation of Highway Drainage and Service Ducts
- Section 9 Model Contract Documents For CCTV Survey of Highway Drainage Systems
Quick Links
Find out how to make sure you're seeing the latest version of the site
Further Technical Documents
All the material previously located in the ‘Quick Links’ area of this page can now be found in the new ‘Further Further Technical Information’ section.
Quick Links
Find out how to make sure you're seeing the latest version of the site
Further Technical Documents
All the material previously located in the ‘Quick Links’ area of this page can now be found in the new ‘Further Further Technical Information’ section.

